Category:Detail 350.01: Difference between revisions

From DelDOT Project Development Manual
Jump to navigation Jump to search
Jtice (talk | contribs)
Created page with "==PIPE CULVERT DETAILS== ==Changelog== ===2022=== * Sheet 1 ** Updated guardrail over culvert to depict current standards. ** Adjusted pipe sizes in plan view to match. ** Differentiated geotextile, riprap and geotextile, stabilization. ** Added min spacing between pipes when flowable fill is used. ** Added reference to Designer Note 10. * Sheet 2 ** Updated guardrail over culverts on section view for current standards. ** Changed note for offset to hinge. ** Edited Des..."
 
Jtice (talk | contribs)
Corrected changelog
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
** Updated guardrail over culvert to depict current standards.
** Updated guardrail over culvert to depict current standards.
** Adjusted pipe sizes in plan view to match.
** Adjusted pipe sizes in plan view to match.
** Differentiated geotextile, riprap and geotextile, stabilization.
** Added min spacing between pipes when flowable fill is used.
** Added min spacing between pipes when flowable fill is used.
** Added reference to Designer Note 10.
* Sheet 2
* Sheet 2
** Updated guardrail over culverts on section view for current standards.
** Updated guardrail over culverts on section view for current standards.
** Differentiated geotextile, riprap and geotextile, stabilization.
** Changed note for offset to hinge.
** Changed note for offset to hinge.
** Edited Designer Note 10
** Edited Designer Note 10
** Added reference to Designer Note 10.


[[Category:300 - Typical Bridge Design Details]]
[[Category:300 - Typical Bridge Design Details]]
[[Category:Culvert Details]]

Latest revision as of 16:03, 3 November 2022

PIPE CULVERT DETAILS

Changelog

2022

  • Sheet 1
    • Updated guardrail over culvert to depict current standards.
    • Adjusted pipe sizes in plan view to match.
    • Added min spacing between pipes when flowable fill is used.
  • Sheet 2
    • Updated guardrail over culverts on section view for current standards.
    • Differentiated geotextile, riprap and geotextile, stabilization.
    • Changed note for offset to hinge.
    • Edited Designer Note 10
    • Added reference to Designer Note 10.

This category currently contains no pages or media.