Chapter 2 - Project Origination and Planning: Difference between revisions

From DelDOT Project Development Manual
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
DelDOT currently uses a software called “Decision-Lens” to ensure the development of a performance and formula-based program. DelDOT’s prioritization process is more fully described within its <ref>https://deldot.gov/Publications/reports/CTP/pdfs/DelDOT_project_prioritization_criteria_summary.pdf?cache=1685790517045</ref>Project Prioritization Criteria summary document.
DelDOT currently uses a software called “Decision-Lens” to ensure the development of a performance and formula-based program. DelDOT’s prioritization process is more fully described within its <ref>https://deldot.gov/Publications/reports/CTP/pdfs/DelDOT_project_prioritization_criteria_summary.pdf?cache=1685790517045</ref>Project Prioritization Criteria summary document.
<references /><nowiki><u>29 Del. C § 8419 (3)</u></nowiki>
<references /><nowiki>
 
 
The Long-Range Transportation Plan is approved by the COT in accordance with <u>29 Del. C § 8419 (3)</u> of the Delaware Code before being provided to the FHWA and FTA for informational purposes. All updates made to the Long-Range Transportation Plan require public review and comment and approval by both the FHWA and FTA.

Revision as of 19:45, 1 February 2024

DelDOT currently uses a software called “Decision-Lens” to ensure the development of a performance and formula-based program. DelDOT’s prioritization process is more fully described within its [1]Project Prioritization Criteria summary document.

<nowiki>


The Long-Range Transportation Plan is approved by the COT in accordance with 29 Del. C § 8419 (3) of the Delaware Code before being provided to the FHWA and FTA for informational purposes. All updates made to the Long-Range Transportation Plan require public review and comment and approval by both the FHWA and FTA.