Chapter 2 - Project Origination and Planning: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
DelDOT currently uses a software called “Decision-Lens” to ensure the development of a performance and formula-based program. DelDOT’s prioritization process is more fully described within its <ref>https://deldot.gov/Publications/reports/CTP/pdfs/DelDOT_project_prioritization_criteria_summary.pdf?cache=1685790517045</ref>Project Prioritization Criteria summary document. | DelDOT currently uses a software called “Decision-Lens” to ensure the development of a performance and formula-based program. DelDOT’s prioritization process is more fully described within its <ref>https://deldot.gov/Publications/reports/CTP/pdfs/DelDOT_project_prioritization_criteria_summary.pdf?cache=1685790517045</ref>Project Prioritization Criteria summary document. | ||
<references /> | <references /> | ||
The Long-Range Transportation Plan is approved by the COT in accordance with [https://delcode.delaware.gov/title29/c084/index.html]29 Del. C § 8419 (3) of the Delaware Code before being provided to the FHWA and FTA for informational purposes. All updates made to the Long-Range Transportation Plan require public review and comment and approval by both the FHWA and FTA. | |||
[https://delcode.delaware.gov/ Delaware Code] | |||
Revision as of 19:52, 1 February 2024
DelDOT currently uses a software called “Decision-Lens” to ensure the development of a performance and formula-based program. DelDOT’s prioritization process is more fully described within its [1]Project Prioritization Criteria summary document.
The Long-Range Transportation Plan is approved by the COT in accordance with [1]29 Del. C § 8419 (3) of the Delaware Code before being provided to the FHWA and FTA for informational purposes. All updates made to the Long-Range Transportation Plan require public review and comment and approval by both the FHWA and FTA.