Chapter 2 - Project Origination and Planning: Difference between revisions

From DelDOT Project Development Manual
Jump to navigation Jump to search
No edit summary
Line 5: Line 5:


== 2.1 Planning Standards ==
== 2.1 Planning Standards ==
To be eligible to receive federal funds, a state department of transportation (DOT) is required to carry out a continuing, cooperative, and comprehensive performance-based statewide multimodal transportation planning process in accordance with [https://www.ecfr.gov/current/title-23/chapter-I/subchapter-E/part-450 23 CFR 450]. DelDOT’s Division of Planning is charged with overseeing and coordinating with necessary stakeholders both internal and external to DelDOT to maintain a federally compliant statewide planning process that considers the factors described in [https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title23-section135&num=0&edition=prelim 23 U.S.C. 135(d)(1)] and [https://www.ecfr.gov/current/title-23/chapter-I/subchapter-E/part-450 23 CFR 450.206(a)]. This section of the manual serves to summarize several key aspects of a compliant planning process.

Revision as of 17:10, 2 February 2024

Project origination and planning is the first step in DelDOT’s project development process. Project origination refers to the creation of the project, including initial development and conceptualization of a transportation project. It involves the identification of transportation needs and deficiencies, assessment of alternatives, and the initiation of a project planning process. Project origination typically includes activities such as conducting feasibility studies, evaluating potential impacts, determining project scope, and identifying potential funding sources. It is the starting point for formally defining and advancing a transportation project from an initial idea to a well-defined concept that can be further developed and eventually implemented.


Transportation project planning and programming is regulated at a federal-level and conducted through regional, state, and local-scale to ensure implementation of a process and improvements that consider the needs and desires of the end users. Understanding a project’s origination and purpose and need is crucial to ensure the development of contextually sensitive solutions that effectively address the underlying transportation deficiency. This chapter describes the mechanisms, processes, and associated standards that are used to plan, prioritize, and program projects within the State of Delaware.

2.1 Planning Standards

To be eligible to receive federal funds, a state department of transportation (DOT) is required to carry out a continuing, cooperative, and comprehensive performance-based statewide multimodal transportation planning process in accordance with 23 CFR 450. DelDOT’s Division of Planning is charged with overseeing and coordinating with necessary stakeholders both internal and external to DelDOT to maintain a federally compliant statewide planning process that considers the factors described in 23 U.S.C. 135(d)(1) and 23 CFR 450.206(a). This section of the manual serves to summarize several key aspects of a compliant planning process.