     <p><b>[[Chapter 1 - Introduction#1.1 Federal and State Requirements|Section 1.1 – Federal and State Requirements]]</b>: This section presents the framework of the laws, regulations, and other regulatory agency policy or advisory guidance at both the state and federal level which direct the DelDOT project development process. The section introduces the FHWA Federal-aid Highway Program and the DelDOT and FHWA Stewardship and Oversight agreement and its role in defining the DelDOT project development process.</p>
     <p><b>[[Chapter 1 - Introduction#1.1 Federal and State Requirements|Section 1.1 – Federal and State Requirements]]</b>: This section presents the framework of the laws, regulations, and other regulatory agency policy or advisory guidance at both the state and federal level which direct the DelDOT project development process. The section introduces the FHWA Federal-aid Highway Program and the DelDOT and FHWA Stewardship and Oversight agreement and its role in defining the DelDOT project development process.</p>


     <b>[[Chapter 1 - Introduction#1.2 Applicability to Local Public Agencies|Section 1.2 - Applicability to Local Public Agencies]]</b>: This section establishes the manual’s applicability to local public agencies.
     <p><b>[[Chapter 1 - Introduction#1.2 Applicability to Local Public Agencies|Section 1.2 - Applicability to Local Public Agencies]]</b>: This section establishes the manual’s applicability to local public agencies.</p>


    <b>[[Chapter 1 - Introduction#1.3 References to Other Resources|Section 1.3 - References to Other Resources]]</b>: This section clarifies that the manual is not intended to replace other source documents referenced throughout the manual.
        <p><b>[[Chapter 1 - Introduction#1.3 References to Other Resources|Section 1.3 - References to Other Resources]]</b>: This section clarifies that the manual is not intended to replace other source documents referenced throughout the manual.</p>


         <div class="tab">
         <div class="tab">
             <b>[[Chapter 1 - Introduction#1.3.1 DelDOT Developed Resource Documents|Section 1.3.1 - DelDOT Developed Resource Documents]]</b>: This section lists and describes the resource documents DelDOT utilizes including manuals, Design Guidance Memorandums (DGMs), Policy Implements (PIs), Engineering Instructions (EIs), formal memorandums, and other guidance documents. The section also provides several considerations for the assigned update team when revising these DelDOT developed resource documents.
             <p><b>[[Chapter 1 - Introduction#1.3.1 DelDOT Developed Resource Documents|Section 1.3.1 - DelDOT Developed Resource Documents]]</b>: This section lists and describes the resource documents DelDOT utilizes including manuals, Design Guidance Memorandums (DGMs), Policy Implements (PIs), Engineering Instructions (EIs), formal memorandums, and other guidance documents. The section also provides several considerations for the assigned update team when revising these DelDOT developed resource documents.</p>
         </div>
         </div>


     <b>[[Chapter 1 - Introduction#1.4 Maintaining the Project Development Manual|Section 1.4 - Maintaining the Project Development Manual]]</b>: This section establishes the process which DelDOT will use to maintain the Project Development manual and outlines how manual users can provide feedback.
     <p><b>[[Chapter 1 - Introduction#1.4 Maintaining the Project Development Manual|Section 1.4 - Maintaining the Project Development Manual]]</b>: This section establishes the process which DelDOT will use to maintain the Project Development manual and outlines how manual users can provide feedback.</p>
</div>
</div>
<div>
<div>
Line 41: Line 41:


     <div class="tab">
     <div class="tab">
         <b>[[Chapter 2 - Project Origination and Planning#2.1 Planning Standards|Section 2.1 - Planning Standards]]</b>: This section describes the federal planning standards that a state must follow to be eligible for federal funding through the Federal-aid Highway Program. This section has been divided into subsections for clarity.
         <p><b>[[Chapter 2 - Project Origination and Planning#2.1 Planning Standards|Section 2.1 - Planning Standards]]</b>: This section describes the federal planning standards that a state must follow to be eligible for federal funding through the Federal-aid Highway Program. This section has been divided into subsections for clarity.</p>
             <div class="tab">
             <div class="tab">
                 <b>[[Chapter 2 - Project Origination and Planning#2.1.1 Contributing Organizations|Section 2.1.1 - Contributing Organizations]]</b>: This section defines the entities involved in the federal planning and programming process as well as describes their responsibilities.
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.1.1 Contributing Organizations|Section 2.1.1 - Contributing Organizations]]</b>: This section defines the entities involved in the federal planning and programming process as well as describes their responsibilities.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 2 - Project Origination and Planning#2.1.1.1 Metropolitan Planning Organizations|Section 2.1.1.1 - Metropolitan Planning Organizations]]</b>
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.1.1.1 Metropolitan Planning Organizations|Section 2.1.1.1 - Metropolitan Planning Organizations]]</b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.1.1.2 Regional Transportation Planning Organizations (RTPOs) and Local Governments|Section 2.1.1.2 - Regional Transportation Planning Organizations (RTPOs) and Local Governments]]</b>
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.1.1.2 Regional Transportation Planning Organizations (RTPOs) and Local Governments|Section 2.1.1.2 - Regional Transportation Planning Organizations (RTPOs) and Local Governments]]</b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.1.1.3 Public Transportation Operators|Section 2.1.1.3 - Public Transportation Operators]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.1.1.3 Public Transportation Operators|Section 2.1.1.3 - Public Transportation Operators]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.1.1.4 Council on Transportation|Section 2.1.1.4 - Council on Transportation]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.1.1.4 Council on Transportation|Section 2.1.1.4 - Council on Transportation]]
                         </b>
                         </b></p>
                     </div>
                     </div>
                 <b>[[Chapter 2 - Project Origination and Planning#2.1.2 Performance-Based Approach|Section 2.1.2 - Performance-Based Approach]]
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.1.2 Performance-Based Approach|Section 2.1.2 - Performance-Based Approach]]
                 </b>: DelDOT is required to utilize a performance-based prioritization process in accordance with state and federal requirements. This section defines these requirements and describes the processes DelDOT has implemented.
                 </b>: DelDOT is required to utilize a performance-based prioritization process in accordance with state and federal requirements. This section defines these requirements and describes the processes DelDOT has implemented.</p>


                 <b>[[Chapter 2 - Project Origination and Planning#2.1.3 Public Involvement|Section 2.1.3 - Public Involvement]]
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.1.3 Public Involvement|Section 2.1.3 - Public Involvement]]
                 </b>: Public involvement is required in the planning and programming process transportation infrastructure has significant impact on communities. This section defines the public involvement processes DelDOT has implemented to ensure proactive and well-thought-out public engagement.
                 </b>: Public involvement is required in the planning and programming process transportation infrastructure has significant impact on communities. This section defines the public involvement processes DelDOT has implemented to ensure proactive and well-thought-out public engagement.</p>


                 <b>[[Chapter 2 - Project Origination and Planning#2.1.4 Deliverables|Section 2.1.4 - Deliverables]]
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.1.4 Deliverables|Section 2.1.4 - Deliverables]]
                 </b>: DelDOT’s planning process will result in the creation of numerous deliverables. This section’s subsections describe the two deliverables required of DelDOT by federal and state law.
                 </b>: DelDOT’s planning process will result in the creation of numerous deliverables. This section’s subsections describe the two deliverables required of DelDOT by federal and state law.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 2 - Project Origination and Planning#2.1.4.1 Long-Range Transportation Plan|Section 2.1.4.1 - Long-Range Transportation Plan]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.1.4.1 Long-Range Transportation Plan|Section 2.1.4.1 - Long-Range Transportation Plan]]
                         </b>: This planning deliverable is intended to guide DelDOT in creating principles, policies, and performance measures meeting the State’s long-range economic, transportation, development, and sustainability goals over the forecast period.
                         </b>: This planning deliverable is intended to guide DelDOT in creating principles, policies, and performance measures meeting the State’s long-range economic, transportation, development, and sustainability goals over the forecast period.</p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.1.4.2 Statewide Transportation Improvement Program (STIP)|Section 2.1.4.2 - Statewide Transportation Improvement Program (STIP)]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.1.4.2 Statewide Transportation Improvement Program (STIP)|Section 2.1.4.2 - Statewide Transportation Improvement Program (STIP)]]
                         </b>: This planning deliverable defines a staged, multi-year, statewide intermodal investment program comprised of transportation projects and programs that are consistent with the Long-Range Transportation Plan.
                         </b>: This planning deliverable defines a staged, multi-year, statewide intermodal investment program comprised of transportation projects and programs that are consistent with the Long-Range Transportation Plan.</p>
                     </div>
                     </div>
             </div>
             </div>
         <b>[[Chapter 2 - Project Origination and Planning#2.2 Programs Generating DelDOT Projects|Section 2.2 - Programs Generating DelDOT Projects]]
         <p><b>[[Chapter 2 - Project Origination and Planning#2.2 Programs Generating DelDOT Projects|Section 2.2 - Programs Generating DelDOT Projects]]
         </b>: DelDOT maintains multiple programs across its Divisions which each have their own process for generating and prioritizing projects. This section defines the programs and the processes that are used to generate DelDOT projects.
         </b>: DelDOT maintains multiple programs across its Divisions which each have their own process for generating and prioritizing projects. This section defines the programs and the processes that are used to generate DelDOT projects.</p>
             <div class="tab"> <!--h3-->
             <div class="tab"> <!--h3-->
                 <b>[[Chapter 2 - Project Origination and Planning#2.2.1 Entities Outside of DelDOT|Section 2.2.1 - Entities Outside of DelDOT]]
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.1 Entities Outside of DelDOT|Section 2.2.1 - Entities Outside of DelDOT]]
                 </b>: This section introduces its subsections which describe entities and programs outside of DelDOT which have potential to generate DelDOT projects.
                 </b>: This section introduces its subsections which describe entities and programs outside of DelDOT which have potential to generate DelDOT projects.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 2 - Project Origination and Planning#2.2.1.1 MPO Planning Studies|Section 2.2.1.1 - MPO Planning Studies]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.1.1 MPO Planning Studies|Section 2.2.1.1 - MPO Planning Studies]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.1.2 Studies Generated by a Third Party|Section 2.2.1.2 - Studies Generated by a Third Party]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.1.2 Studies Generated by a Third Party|Section 2.2.1.2 - Studies Generated by a Third Party]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.1.3 Projects Mandated to Complete|Section 2.2.1.3 - Projects Mandated to Complete]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.1.3 Projects Mandated to Complete|Section 2.2.1.3 - Projects Mandated to Complete]]
                         </b>
                         </b></p>
                     </div>
                     </div>
                 <b>[[Chapter 2 - Project Origination and Planning#2.2.2 Division of Planning|Section 2.2.2 - Division of Planning]]
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.2 Division of Planning|Section 2.2.2 - Division of Planning]]
                 </b>: DelDOT’s Division of Planning undertakes various planning level studies which could generate DelDOT projects. This section’s subsections describe the individual planning programs overseen by the Division of Planning that may generate DelDOT projects.
                 </b>: DelDOT’s Division of Planning undertakes various planning level studies which could generate DelDOT projects. This section’s subsections describe the individual planning programs overseen by the Division of Planning that may generate DelDOT projects.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 2 - Project Origination and Planning#2.2.2.1 Corridor Capacity Preservation Program|Section 2.2.2.1 - Corridor Capacity Preservation Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.2.1 Corridor Capacity Preservation Program|Section 2.2.2.1 - Corridor Capacity Preservation Program]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.2.2 Multi-Modal Program|Section 2.2.2.2 - Multi-Modal Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.2.2 Multi-Modal Program|Section 2.2.2.2 - Multi-Modal Program]]
                         </b>: This section introduces its subsections which describe the individual programs managed within DelDOT’s Multi-Modal program.
                         </b>: This section introduces its subsections which describe the individual programs managed within DelDOT’s Multi-Modal program.</p>
                             <div class="tab">
                             <div class="tab">
                                 <b>[[Chapter 2 - Project Origination and Planning#2.2.2.2.1 Transportation Alternatives Program (TAP Program)|Section 2.2.2.2.1 - Transportation Alternatives Program (TAP Program)]]
                                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.2.2.1 Transportation Alternatives Program (TAP Program)|Section 2.2.2.2.1 - Transportation Alternatives Program (TAP Program)]]
                                 </b>
                                 </b></p>


                                 <b>[[Chapter 2 - Project Origination and Planning#2.2.2.2.2 Bicycle and Pedestrian Program|Section 2.2.2.2.2 - Bicycle and Pedestrian Program]]
                                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.2.2.2 Bicycle and Pedestrian Program|Section 2.2.2.2.2 - Bicycle and Pedestrian Program]]
                                 </b>
                                 </b></p>


                                 <b>[[Chapter 2 - Project Origination and Planning#2.2.2.2.3 Pedestrian Access Route Program|Section 2.2.2.2.3 - Pedestrian Access Route Program]]
                                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.2.2.3 Pedestrian Access Route Program|Section 2.2.2.2.3 - Pedestrian Access Route Program]]
                                 </b>
                                 </b></p>


                                 <b>[[Chapter 2 - Project Origination and Planning#2.2.2.2.4 Recreational Trails Program|Section 2.2.2.2.4 - Recreational Trails Program]]
                                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.2.2.4 Recreational Trails Program|Section 2.2.2.2.4 - Recreational Trails Program]]
                                 </b>
                                 </b></p>
                             </div>
                             </div>
                         <b>[[Chapter 2 - Project Origination and Planning#2.2.2.3 Transportation Improvement Districts (TIDs)|Section 2.2.2.3 - Transportation Improvement Districts (TIDs)]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.2.3 Transportation Improvement Districts (TIDs)|Section 2.2.2.3 - Transportation Improvement Districts (TIDs)]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.2.4 Aviation Planning|Section 2.2.2.4 - Aviation Planning]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.2.4 Aviation Planning|Section 2.2.2.4 - Aviation Planning]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.2.5 Freight Planning|Section 2.2.2.5 - Freight Planning]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.2.5 Freight Planning|Section 2.2.2.5 - Freight Planning]]
                         </b>  
                         </b> </p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.2.6 Federal Land Access Program (FLAP)|Section 2.2.2.6 - Federal Land Access Program (FLAP)]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.2.6 Federal Land Access Program (FLAP)|Section 2.2.2.6 - Federal Land Access Program (FLAP)]]
                         </b>
                         </b></p>
                     </div>
                     </div>
                 <b>[[Chapter 2 - Project Origination and Planning#2.2.3 Structures Program|Section 2.2.3 - Structures Program]]
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.3 Structures Program|Section 2.2.3 - Structures Program]]
                 </b>: This section introduces its subsections which describe the three programs DelDOT uses to evaluate, plan, and prioritize structure maintenance throughout the State.
                 </b>: This section introduces its subsections which describe the three programs DelDOT uses to evaluate, plan, and prioritize structure maintenance throughout the State.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 2 - Project Origination and Planning#2.2.3.1 Bridge Structures Program|Section 2.2.3.1 - Bridge Structures Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.3.1 Bridge Structures Program|Section 2.2.3.1 - Bridge Structures Program]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.3.2 Overhead Sign and High Mast Lighting Structures Program|Section 2.2.3.2 - Overhead Sign and High Mast Lighting Structures Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.3.2 Overhead Sign and High Mast Lighting Structures Program|Section 2.2.3.2 - Overhead Sign and High Mast Lighting Structures Program]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.3.3 Dam Program|Section 2.2.3.3 - Dam Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.3.3 Dam Program|Section 2.2.3.3 - Dam Program]]
                         </b>
                         </b></p>
                     </div>
                     </div>
                 <b>[[Chapter 2 - Project Origination and Planning#2.2.4 Pavement Management Program|Section 2.2.4 - Pavement Management Program]]
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.4 Pavement Management Program|Section 2.2.4 - Pavement Management Program]]
                 </b>
                 </b></p>


                 <b>[[Chapter 2 - Project Origination and Planning#2.2.5 Traffic Engineering and Traffic Operations|Section 2.2.5 - Traffic Engineering and Traffic Operations]]
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5 Traffic Engineering and Traffic Operations|Section 2.2.5 - Traffic Engineering and Traffic Operations]]
                 </b>: This section introduces the specific strategic programs that DelDOT uses to identify operational and mobility deficiencies and potential safety related infrastructure improvement needs. Specific programs are further described within its subsections.
                 </b>: This section introduces the specific strategic programs that DelDOT uses to identify operational and mobility deficiencies and potential safety related infrastructure improvement needs. Specific programs are further described within its subsections.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 2 - Project Origination and Planning#2.2.5.1 Traffic Calming Program|Section 2.2.5.1 - Traffic Calming Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.1 Traffic Calming Program|Section 2.2.5.1 - Traffic Calming Program]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.5.2 MUTCD Compliance Program|Section 2.2.5.2 - MUTCD Compliance Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.2 MUTCD Compliance Program|Section 2.2.5.2 - MUTCD Compliance Program]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.5.3 Highway Safety Improvement Program (HSIP)|Section 2.2.5.3 - Highway Safety Improvement Program (HSIP)]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.3 Highway Safety Improvement Program (HSIP)|Section 2.2.5.3 - Highway Safety Improvement Program (HSIP)]]
                         </b>: This section describes DelDOT’s federally required HSIP program. This section’s subsections describe the individual programs included within DelDOT’s HSIP program.
                         </b>: This section describes DelDOT’s federally required HSIP program. This section’s subsections describe the individual programs included within DelDOT’s HSIP program.</p>
                             <div class="tab">
                             <div class="tab">
                                 <b>[[Chapter 2 - Project Origination and Planning#2.2.5.3.1 Hazard Elimination Program (HEP)|Section 2.2.5.3.1 - Hazard Elimination Program (HEP)]]
                                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.3.1 Hazard Elimination Program (HEP)|Section 2.2.5.3.1 - Hazard Elimination Program (HEP)]]
                                 1</b>
                                 1</b></p>


                                 <b>[[Chapter 2 - Project Origination and Planning#2.2.5.3.2 High-Risk Rural Roads Program|Section 2.2.5.3.2 - High-Risk Rural Roads Program]]
                                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.3.2 High-Risk Rural Roads Program|Section 2.2.5.3.2 - High-Risk Rural Roads Program]]
                                 </b>
                                 </b></p>


                                 <b>[[Chapter 2 - Project Origination and Planning#2.2.5.3.3 Railway-Highway Crossing Safety (RCHP)|Section 2.2.5.3.3 - Railway-Highway Crossing Safety (RCHP)]]
                                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.3.3 Railway-Highway Crossing Safety (RCHP)|Section 2.2.5.3.3 - Railway-Highway Crossing Safety (RCHP)]]
                                 </b>
                                 </b></p>


                                 <b>[[Chapter 2 - Project Origination and Planning#2.2.5.3.4 Systemic Safety Programs|Section 2.2.5.3.4 - Systemic Safety Programs]]
                                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.3.4 Systemic Safety Programs|Section 2.2.5.3.4 - Systemic Safety Programs]]
                                 </b>
                                 </b></p>
                             </div>
                             </div>
                         <b>[[Chapter 2 - Project Origination and Planning#2.2.5.4 Railroad Program|Section 2.2.5.4 - Railroad Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.4 Railroad Program|Section 2.2.5.4 - Railroad Program]]
                         </b>: This section introduces the individual programs that are included within DelDOT’s Railroad Program. These programs are further described within its subsections.
                         </b>: This section introduces the individual programs that are included within DelDOT’s Railroad Program. These programs are further described within its subsections.</p>
                             <div class="tab">
                             <div class="tab">
                                 <b>[[Chapter 2 - Project Origination and Planning#2.2.5.4.1 Statewide Railroad Rideability Program|Section 2.2.5.4.1 - Statewide Railroad Rideability Program]]
                                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.4.1 Statewide Railroad Rideability Program|Section 2.2.5.4.1 - Statewide Railroad Rideability Program]]
                                 </b>
                                 </b></p>


                                 <b>[[Chapter 2 - Project Origination and Planning#2.2.5.4.2 Rail Preservation Maintenance Program|Section 2.2.5.4.2 - Rail Preservation Maintenance Program]]
                                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.4.2 Rail Preservation Maintenance Program|Section 2.2.5.4.2 - Rail Preservation Maintenance Program]]
                                 </b>
                                 </b></p>


                                 <b>[[Chapter 2 - Project Origination and Planning#2.2.5.4.3 Railroad Capital Improvements|Section 2.2.5.4.3 - Railroad Capital Improvements]]
                                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.4.3 Railroad Capital Improvements|Section 2.2.5.4.3 - Railroad Capital Improvements]]
                                 </b>
                                 </b></p>
                             </div>
                             </div>
                         <b>[[Chapter 2 - Project Origination and Planning#2.2.5.5 Intelligent Transportation Management Systems (ITMS)|Section 2.2.5.5 - Intelligent Transportation Management Systems (ITMS)]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.5.5 Intelligent Transportation Management Systems (ITMS)|Section 2.2.5.5 - Intelligent Transportation Management Systems (ITMS)]]
                         </b>
                         </b></p>
                     </div>
                     </div>


                 <b>[[Chapter 2 - Project Origination and Planning#2.2.6 Division of Maintenance and Operations|Section 2.2.6 - Division of Maintenance and Operations]]
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.6 Division of Maintenance and Operations|Section 2.2.6 - Division of Maintenance and Operations]]
                 </b>: This section introduces the programs that are managed by DelDOT’s Division of Maintenance and Operations which are more fully described within its subsections.
                 </b>: This section introduces the programs that are managed by DelDOT’s Division of Maintenance and Operations which are more fully described within its subsections.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 2 - Project Origination and Planning#2.2.6.1 Community Transportation Fund|Section 2.2.6.1 - Community Transportation Fund]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.6.1 Community Transportation Fund|Section 2.2.6.1 - Community Transportation Fund]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.6.2 Building Facilities|Section 2.2.6.2 - Building Facilities]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.6.2 Building Facilities|Section 2.2.6.2 - Building Facilities]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.6.3 Subdivision Street Pavement Management Program|Section 2.2.6.3 - Subdivision Street Pavement Management Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.6.3 Subdivision Street Pavement Management Program|Section 2.2.6.3 - Subdivision Street Pavement Management Program]]
                         </b>
                         </b></p>
                     </div>
                     </div>
                 <b>[[Chapter 2 - Project Origination and Planning#2.2.7 Sustainability|Section 2.2.7 - Sustainability]]
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.7 Sustainability|Section 2.2.7 - Sustainability]]
                 </b>: This section introduces its subsections which describe the individual programs that DelDOT uses to plan and prioritize its sustainability program.
                 </b>: This section introduces its subsections which describe the individual programs that DelDOT uses to plan and prioritize its sustainability program.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 2 - Project Origination and Planning#2.2.7.1 Resilience and Sustainability Program|Section 2.2.7.1 - Resilience and Sustainability Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.7.1 Resilience and Sustainability Program|Section 2.2.7.1 - Resilience and Sustainability Program]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.7.2 Carbon Reduction Program|Section 2.2.7.2 - Carbon Reduction Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.7.2 Carbon Reduction Program|Section 2.2.7.2 - Carbon Reduction Program]]
                         </b>
                         </b></p>


                         <b>[[Chapter 2 - Project Origination and Planning#2.2.7.3 Electric Vehicle Charging Program|Section 2.2.7.3 - Electric Vehicle Charging Program]]
                         <p><b>[[Chapter 2 - Project Origination and Planning#2.2.7.3 Electric Vehicle Charging Program|Section 2.2.7.3 - Electric Vehicle Charging Program]]
                         </b>
                         </b></p>
                     </div>
                     </div>
                 <b>[[Chapter 2 - Project Origination and Planning#2.2.8 Transit Systems (Delaware Transit Corporation)|Section 2.2.8 - Transit Systems (Delaware Transit Corporation)]]
                 <p><b>[[Chapter 2 - Project Origination and Planning#2.2.8 Transit Systems (Delaware Transit Corporation)|Section 2.2.8 - Transit Systems (Delaware Transit Corporation)]]
                 </b>
                 </b></p>
             </div> <!--end of h3-->
             </div> <!--end of h3-->
     </div> <!--end of h2-->
     </div> <!--end of h2-->
Line 212: Line 212:


     <div class="tab"> <!--h2-->
     <div class="tab"> <!--h2-->
         <b>[[Chapter 3 - Project Initiation#3.1 Establishment of the Design Team|Section 3.1 - Establishment of the Design Team]]
         <p><b>[[Chapter 3 - Project Initiation#3.1 Establishment of the Design Team|Section 3.1 - Establishment of the Design Team]]
         </b>
         </b></p>
         This section defines the role of the DelDOT Project Manager and the technical design staff assigned to a develop a project. The section also provides considerations to be evaluated when assembling the design team.
         This section defines the role of the DelDOT Project Manager and the technical design staff assigned to a develop a project. The section also provides considerations to be evaluated when assembling the design team.
             <div class="tab">
             <div class="tab">
                 <b>[[Chapter 3 - Project Initiation#3.1.1 Support Groups|Section 3.1.1 - Support Groups]]
                 <p><b>[[Chapter 3 - Project Initiation#3.1.1 Support Groups|Section 3.1.1 - Support Groups]]
                 </b>: This section defines DelDOT’s Support Groups and establishes their role in the project development process.
                 </b>: This section defines DelDOT’s Support Groups and establishes their role in the project development process.</p>
             </div>
             </div>


         <b>[[Chapter 3 - Project Initiation#3.2 Project Baselining|Section 3.2 - Project Baselining]]
         <p><b>[[Chapter 3 - Project Initiation#3.2 Project Baselining|Section 3.2 - Project Baselining]]
         </b>: This section introduces the concept of project baselining and introduces its subsections.
         </b>: This section introduces the concept of project baselining and introduces its subsections.</p>
             <div class="tab"> <!--h3-->
             <div class="tab"> <!--h3-->
                 <b>[[Chapter 3 - Project Initiation#3.2.1 Initial Project Baselining|Section 3.2.1 - Initial Project Baselining]]
                 <p><b>[[Chapter 3 - Project Initiation#3.2.1 Initial Project Baselining|Section 3.2.1 - Initial Project Baselining]]
                 </b>: This section establishes the interrelated elements of the initial project baselining effort and introduces its subsections which defines each element and its associated considerations in more detail.
                 </b>: This section establishes the interrelated elements of the initial project baselining effort and introduces its subsections which defines each element and its associated considerations in more detail.</p>
                     <div class="tab">   
                     <div class="tab">   
                         <b>[[Chapter 3 - Project Initiation#3.2.1.1 Schedule|Section 3.2.1.1 - Schedule]]
                         <p><b>[[Chapter 3 - Project Initiation#3.2.1.1 Schedule|Section 3.2.1.1 - Schedule]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.2.1.2 Budget|Section 3.2.1.2 - Budget]]
                         <p><b>[[Chapter 3 - Project Initiation#3.2.1.2 Budget|Section 3.2.1.2 - Budget]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.2.1.3 Initial Environmental Evaluation|Section 3.2.1.3 - Initial Environmental Evaluation]]
                         <p><b>[[Chapter 3 - Project Initiation#3.2.1.3 Initial Environmental Evaluation|Section 3.2.1.3 - Initial Environmental Evaluation]]
                         </b>
                         </b></p>
                     </div>
                     </div>
                 <b>[[Chapter 3 - Project Initiation#3.2.2 Project Re-Baselining|Section 3.2.2 - Project Re-Baselining]]
                 <p><b>[[Chapter 3 - Project Initiation#3.2.2 Project Re-Baselining|Section 3.2.2 - Project Re-Baselining]]
                 </b>: This section emphasizes the importance of re-baselining projects and introduces its subsections which describe two specific re-baselining activities.
                 </b>: This section emphasizes the importance of re-baselining projects and introduces its subsections which describe two specific re-baselining activities.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 3 - Project Initiation#3.2.2.1 Re-Baselining at Milestone Submissions|Section 3.2.2.1 - Re-Baselining at Milestone Submissions]]
                         <p><b>[[Chapter 3 - Project Initiation#3.2.2.1 Re-Baselining at Milestone Submissions|Section 3.2.2.1 - Re-Baselining at Milestone Submissions]]
                         </b>: This section describes DelDOT’s policy of re-baselining projects within Unifier at each milestone submission.  
                         </b>: This section describes DelDOT’s policy of re-baselining projects within Unifier at each milestone submission. </p>


                         <b>[[Chapter 3 - Project Initiation#3.2.2.2 Spend Updates|Section 3.2.2.2 - Spend Updates]]
                         <p><b>[[Chapter 3 - Project Initiation#3.2.2.2 Spend Updates|Section 3.2.2.2 - Spend Updates]]
                         </b>: This section describes DelDOT’s policy of evaluating the actual rate of project expenditures compared to the expected expenditure rate in order to evaluate the accuracy of a project’s spending plan.
                         </b>: This section describes DelDOT’s policy of evaluating the actual rate of project expenditures compared to the expected expenditure rate in order to evaluate the accuracy of a project’s spending plan.</p>
                     </div>
                     </div>
             </div>
             </div>
         <b>[[Chapter 3 - Project Initiation#3.3 Project Number Request|Section 3.3 - Project Number Request]]
         <p><b>[[Chapter 3 - Project Initiation#3.3 Project Number Request|Section 3.3 - Project Number Request]]
         </b>: This section describes the process to obtain a project number through DelDOT’s Unifier software.
         </b>: This section describes the process to obtain a project number through DelDOT’s Unifier software.</p>


         <b>[[Chapter 3 - Project Initiation#3.4 Professional Services|Section 3.4 - Professional Services]]
         <p><b>[[Chapter 3 - Project Initiation#3.4 Professional Services|Section 3.4 - Professional Services]]
         </b>: This section introduces the concept of professional services and introduces its subsections.
         </b>: This section introduces the concept of professional services and introduces its subsections.</p>
             <div class="tab">
             <div class="tab">


                 <b>[[Chapter 3 - Project Initiation#3.4.1 Professional Services Procurement|Section 3.4.1 - Professional Services Procurement]]
                 <p><b>[[Chapter 3 - Project Initiation#3.4.1 Professional Services Procurement|Section 3.4.1 - Professional Services Procurement]]
                 </b>: This section introduces DelDOT’s Professional Services Procurement manual and divides the project development professional services DelDOT procures into two categories which are discussed further within its subsections.
                 </b>: This section introduces DelDOT’s Professional Services Procurement manual and divides the project development professional services DelDOT procures into two categories which are discussed further within its subsections.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 3 - Project Initiation#3.4.1.1 Design Related Professional Services|Section 3.4.1.1 - Design Related Professional Services]]
                         <p><b>[[Chapter 3 - Project Initiation#3.4.1.1 Design Related Professional Services|Section 3.4.1.1 - Design Related Professional Services]]
                         </b>: This section introduces the professional service indefinite delivery/ indefinite quantity (IDIQ) contracts DelDOT utilizes for the typical project development services the Department requires. The section also describes the process DelDOT uses to setup tasks under an IDIQ professional service agreement.
                         </b>: This section introduces the professional service indefinite delivery/ indefinite quantity (IDIQ) contracts DelDOT utilizes for the typical project development services the Department requires. The section also describes the process DelDOT uses to setup tasks under an IDIQ professional service agreement.</p>


                         <b>[[Chapter 3 - Project Initiation#3.4.1.2 Design Support Related Professional Services|Section 3.4.1.2 - Design Support Related Professional Services]]
                         <p><b>[[Chapter 3 - Project Initiation#3.4.1.2 Design Support Related Professional Services|Section 3.4.1.2 - Design Support Related Professional Services]]
                         </b>: This section discusses the design support related professional services DelDOT utilizes (i.e., soil borings, utility designation, test holes etc.). The section also describes the process DelDOT uses to setup tasks under an IDIQ professional service agreement.
                         </b>: This section discusses the design support related professional services DelDOT utilizes (i.e., soil borings, utility designation, test holes etc.). The section also describes the process DelDOT uses to setup tasks under an IDIQ professional service agreement.</p>
                     </div>
                     </div>


                 <b>[[Chapter 3 - Project Initiation#3.4.2 Professional Services Management|Section 3.4.2 - Professional Services Management]]
                 <p><b>[[Chapter 3 - Project Initiation#3.4.2 Professional Services Management|Section 3.4.2 - Professional Services Management]]
                 </b>: This section’s subsections summarize the Project Manager’s responsibilities for managing professional service tasks.
                 </b>: This section’s subsections summarize the Project Manager’s responsibilities for managing professional service tasks.
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 3 - Project Initiation#3.4.2.1 Project Tracking|Section 3.4.2.1 - Project Tracking]]
                         <p><b>[[Chapter 3 - Project Initiation#3.4.2.1 Project Tracking|Section 3.4.2.1 - Project Tracking]]
                         </b>: This section presents project tracking techniques that can be used by the Project Manager to forecast future project milestone submittal dates and associated costs. Techniques presented included performing regularly scheduled task progress meetings and invoice tracking. The section also describes the approval process for extra work.
                         </b>: This section presents project tracking techniques that can be used by the Project Manager to forecast future project milestone submittal dates and associated costs. Techniques presented included performing regularly scheduled task progress meetings and invoice tracking. The section also describes the approval process for extra work.</p>


                         <b>[[Chapter 3 - Project Initiation#3.4.2.2 Invoicing|Section 3.4.2.2 - Invoicing]]
                         <p><b>[[Chapter 3 - Project Initiation#3.4.2.2 Invoicing|Section 3.4.2.2 - Invoicing]]
                         </b>: This section describes the time window and processes that DelDOT uses to verify invoice accuracy and then circulate and approve professional service invoices.
                         </b>: This section describes the time window and processes that DelDOT uses to verify invoice accuracy and then circulate and approve professional service invoices.</p>


                         <b>[[Chapter 3 - Project Initiation#3.4.2.2.1 Fiscal Year End|Section 3.4.2.2.1 - Fiscal Year End]]
                         <p><b>[[Chapter 3 - Project Initiation#3.4.2.2.1 Fiscal Year End|Section 3.4.2.2.1 - Fiscal Year End]]
                         </b>: This section notifies the Project Manager and DelDOT’s contracted professional service vendors to the end of the State fiscal year finance system shut down.
                         </b>: This section notifies the Project Manager and DelDOT’s contracted professional service vendors to the end of the State fiscal year finance system shut down.</p>


                         <b>[[Chapter 3 - Project Initiation#3.4.2.3 Quality Assurance|Section 3.4.2.3 - Quality Assurance]]
                         <p><b>[[Chapter 3 - Project Initiation#3.4.2.3 Quality Assurance|Section 3.4.2.3 - Quality Assurance]]
                         </b>: This section summarizes the Project Manager’s responsibility to perform quality assurance on project deliverables, to review and evaluate the services of the vendor annually, and to document the vendor’s performance at the end of the contract.
                         </b>: This section summarizes the Project Manager’s responsibility to perform quality assurance on project deliverables, to review and evaluate the services of the vendor annually, and to document the vendor’s performance at the end of the contract.</p>


                         <b>[[Chapter 3 - Project Initiation#3.4.2.4 Closeout|Section 3.4.2.4 - Closeout]]
                         <p><b>[[Chapter 3 - Project Initiation#3.4.2.4 Closeout|Section 3.4.2.4 - Closeout]]
                         </b>: This section establishes the process to closeout tasks upon completion or when DelDOT has decided to terminate the service before its completion.
                         </b>: This section establishes the process to closeout tasks upon completion or when DelDOT has decided to terminate the service before its completion.</p>
                     </div>
                     </div>
             </div>
             </div>
         <b>[[Chapter 3 - Project Initiation#3.5 Establishment of Project Directory|Section 3.5 - Establishment of Project Directory]]
         <p><b>[[Chapter 3 - Project Initiation#3.5 Establishment of Project Directory|Section 3.5 - Establishment of Project Directory]]
         </b>: This section establishes the importance of using consistent project directories and introduces its subsections which describe DelDOT’s typical project development related directories.
         </b>: This section establishes the importance of using consistent project directories and introduces its subsections which describe DelDOT’s typical project development related directories.</p>
             <div class="tab">
             <div class="tab">
                 <b>[[Chapter 3 - Project Initiation#3.5.1 ProjectWise|Section 3.5.1 - ProjectWise]]
                 <p><b>[[Chapter 3 - Project Initiation#3.5.1 ProjectWise|Section 3.5.1 - ProjectWise]]
                 </b>
                 </b>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 3 - Project Initiation#3.5.2 \DOTFS08\CADD\Active Designs|Section 3.5.2 - \DOTFS08\CADD\Active Designs]]
                         <p><b>[[Chapter 3 - Project Initiation#3.5.2 \DOTFS08\CADD\Active Designs|Section 3.5.2 - \DOTFS08\CADD\Active Designs]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.5.3 \DOTFS08\CADD\Active Contracts|Section 3.5.3 - \DOTFS08\CADD\Active Contracts]]
                         <p><b>[[Chapter 3 - Project Initiation#3.5.3 \DOTFS08\CADD\Active Contracts|Section 3.5.3 - \DOTFS08\CADD\Active Contracts]]
                         </b>
                         </b></p>
                     </div>
                     </div>
             </div>
             </div>
         <b>[[Chapter 3 - Project Initiation#3.6 Project Scoping|Section 3.6 - Project Scoping]]
         <p><b>[[Chapter 3 - Project Initiation#3.6 Project Scoping|Section 3.6 - Project Scoping]]
         </b>: This section describes the best practices for performing project scoping and arriving at a preferred alternative for further design. The section also introduces the concept of scope management which ensures the project remains consistent with its original objectives.
         </b>: This section describes the best practices for performing project scoping and arriving at a preferred alternative for further design. The section also introduces the concept of scope management which ensures the project remains consistent with its original objectives.</p>
             <div class="tab">
             <div class="tab">
                 <b>[[Chapter 3 - Project Initiation#3.6.1 Define the Project Objective|Section 3.6.1 - Define the Project Objective]]
                 <p><b>[[Chapter 3 - Project Initiation#3.6.1 Define the Project Objective|Section 3.6.1 - Define the Project Objective]]
                 </b>: This section encourages the development of explicit and clear project objectives that indicate why a project is being undertaken and what the project is intended to achieve. The section also introduces the concept of “purpose and need” statements to assist in refining a project’s scope and subsequent objectives.
                 </b>: This section encourages the development of explicit and clear project objectives that indicate why a project is being undertaken and what the project is intended to achieve. The section also introduces the concept of “purpose and need” statements to assist in refining a project’s scope and subsequent objectives.</p>
                 <b>[[Chapter 3 - Project Initiation#3.6.2 Develop the Scoping Process|Section 3.6.2 – Develop the Scoping Process]]
                 <p><b>[[Chapter 3 - Project Initiation#3.6.2 Develop the Scoping Process|Section 3.6.2 – Develop the Scoping Process]]
                 </b>: This section encourages the design team to tailor the scoping process to suit an individual project’s needs. The section’s subsections outline scoping phase considerations and describe scoping phase tools.
                 </b>: This section encourages the design team to tailor the scoping process to suit an individual project’s needs. The section’s subsections outline scoping phase considerations and describe scoping phase tools.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 3 - Project Initiation#3.6.2.1 NEPA Class Requirements|Section 3.6.2.1 – NEPA Class Requirements]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.2.1 NEPA Class Requirements|Section 3.6.2.1 – NEPA Class Requirements]]
                         </b>: This section describes how the NEPA class of a proposed action will affect the project scoping phase.
                         </b>: This section describes how the NEPA class of a proposed action will affect the project scoping phase.</p>


                         <b>[[Chapter 3 - Project Initiation#3.6.2.2 Scoping Meetings|Section 3.6.2.2 – Scoping Meetings]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.2.2 Scoping Meetings|Section 3.6.2.2 – Scoping Meetings]]
                         </b>: This section describes strategies and considerations for conducting meetings with project stakeholders at strategic points in the scoping phase.
                         </b>: This section describes strategies and considerations for conducting meetings with project stakeholders at strategic points in the scoping phase.</p>


                         <b>[[Chapter 3 - Project Initiation#3.6.2.3 Public Involvement|Section 3.6.2.3 – Public Involvement]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.2.3 Public Involvement|Section 3.6.2.3 – Public Involvement]]
                         </b>: This section describes how public involvement can be used to generate public consensus by providing a forum for users to express their needs, ideas, concerns, and perspectives relating to the transportation system while giving DelDOT the opportunity to educate the public about transportation issues, services, and projects.
                         </b>: This section describes how public involvement can be used to generate public consensus by providing a forum for users to express their needs, ideas, concerns, and perspectives relating to the transportation system while giving DelDOT the opportunity to educate the public about transportation issues, services, and projects.</p>
                     </div>
                     </div>


                 <b>[[Chapter 3 - Project Initiation#3.6.3 Establish Preliminary Design Controls and Criteria|Section 3.6.3 – Establish Preliminary Design Controls and Criteria]]
                 <p><b>[[Chapter 3 - Project Initiation#3.6.3 Establish Preliminary Design Controls and Criteria|Section 3.6.3 – Establish Preliminary Design Controls and Criteria]]
                 </b>: This section describes the process for determining the transportation user groups to accommodate and for selecting associated design controls and criteria to ensure the development of suitable alternatives.
                 </b>: This section describes the process for determining the transportation user groups to accommodate and for selecting associated design controls and criteria to ensure the development of suitable alternatives.</p>


                 <b>[[Chapter 3 - Project Initiation#3.6.4 Establish Project Constraints|Section 3.6.4 – Establish Project Constraints]]
                 <p><b>[[Chapter 3 - Project Initiation#3.6.4 Establish Project Constraints|Section 3.6.4 – Establish Project Constraints]]
                 </b>: This section introduces its subsections which detail several common project constraints and limitations that must be vetted within the project scoping phase.
                 </b>: This section introduces its subsections which detail several common project constraints and limitations that must be vetted within the project scoping phase.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 3 - Project Initiation#3.6.4.1 Transportation Operation|Section 3.6.4.1 – Transportation Operation]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.4.1 Transportation Operation|Section 3.6.4.1 – Transportation Operation]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.6.4.2 Environmental|Section 3.6.4.2 – Environmental]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.4.2 Environmental|Section 3.6.4.2 – Environmental]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.6.4.3 Utilities|Section 3.6.4.3 – Utilities]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.4.3 Utilities|Section 3.6.4.3 – Utilities]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.6.4.4 Right-of-Way|Section 3.6.4.4 – Right-of-Way]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.4.4 Right-of-Way|Section 3.6.4.4 – Right-of-Way]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.6.4.5 Railroad|Section 3.6.4.5 – Railroad]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.4.5 Railroad|Section 3.6.4.5 – Railroad]]
                         </b>
                         </b></p>
                     </div>
                     </div>


                 <b>[[Chapter 3 - Project Initiation#3.6.5 Alternatives Development|Section 3.6.5 – Alternatives Development]]
                 <p><b>[[Chapter 3 - Project Initiation#3.6.5 Alternatives Development|Section 3.6.5 – Alternatives Development]]
                 </b>: This section describes the process used to develop conceptual alternatives that meet the project’s objectives while considering the project’s constraints and associated design controls and criteria.
                 </b>: This section describes the process used to develop conceptual alternatives that meet the project’s objectives while considering the project’s constraints and associated design controls and criteria.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 3 - Project Initiation#3.6.5.1 Alternative Types|Section 3.6.5.1 – Alternative Types]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.5.1 Alternative Types|Section 3.6.5.1 – Alternative Types]]
                         </b>: This section describes the array of solutions that can be applied to rectify identified transportation deficiencies and meet the project’s objectives.
                         </b>: This section describes the array of solutions that can be applied to rectify identified transportation deficiencies and meet the project’s objectives.</p>
                     </div>
                     </div>


                 <b>[[Chapter 3 - Project Initiation#3.6.6 Alternativities Assessment|Section 3.6.6 – Alternativities Assessment]]
                 <p><b>[[Chapter 3 - Project Initiation#3.6.6 Alternativities Assessment|Section 3.6.6 – Alternativities Assessment]]
                 </b>: This section describes the process used to evaluate the feasible alternatives developed.
                 </b>: This section describes the process used to evaluate the feasible alternatives developed.</p>


                 <b>[[Chapter 3 - Project Initiation#3.6.7 Process Documentation|Section 3.6.7 – Process Documentation]]
                 <p><b>[[Chapter 3 - Project Initiation#3.6.7 Process Documentation|Section 3.6.7 – Process Documentation]]
                 </b>: This section provides recommendations on how to summarize the early project level decisions so they can be effectively referenced later in the project development process.
                 </b>: This section provides recommendations on how to summarize the early project level decisions so they can be effectively referenced later in the project development process.</p>


                 <b>[[Chapter 3 - Project Initiation#3.6.8 Evaluate Ancillary Considerations|Section 3.6.8 – Evaluate Ancillary Considerations]]
                 <p><b>[[Chapter 3 - Project Initiation#3.6.8 Evaluate Ancillary Considerations|Section 3.6.8 – Evaluate Ancillary Considerations]]
                 </b>: This section introduces its subsections which describe the parameters and considerations to be evaluated once a preferred alternative has been selected.
                 </b>: This section introduces its subsections which describe the parameters and considerations to be evaluated once a preferred alternative has been selected.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 3 - Project Initiation#3.6.8.1 Project Delivery Method|Section 3.6.8.1 – Project Delivery Method]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.8.1 Project Delivery Method|Section 3.6.8.1 – Project Delivery Method]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.6.8.2 Accessibility Requirements|Section 3.6.8.2 – Accessibility Requirements]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.8.2 Accessibility Requirements|Section 3.6.8.2 – Accessibility Requirements]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.6.8.3 Stormwater and Drainage Considerations|Section 3.6.8.3 – Stormwater and Drainage Considerations]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.8.3 Stormwater and Drainage Considerations|Section 3.6.8.3 – Stormwater and Drainage Considerations]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.6.8.4 Safety|Section 3.6.8.4 – Safety]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.8.4 Safety|Section 3.6.8.4 – Safety]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.6.8.5 3D Engineering Content Development|Section 3.6.8.5 – 3D Engineering Content Development]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.8.5 3D Engineering Content Development|Section 3.6.8.5 – 3D Engineering Content Development]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.6.8.6 Resiliency|Section 3.6.8.6 – Resiliency]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.8.6 Resiliency|Section 3.6.8.6 – Resiliency]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.6.8.7 Aesthetics|Section 3.6.8.7 – Aesthetics]]
                         <p><b>[[Chapter 3 - Project Initiation#3.6.8.7 Aesthetics|Section 3.6.8.7 – Aesthetics]]
                         </b>
                         </b></p>
                     </div>
                     </div>
             </div>
             </div>
         <b>[[Chapter 3 - Project Initiation#3.7 Existing Site Investigation|Section 3.7 – Existing Site Investigation]]
         <p><b>[[Chapter 3 - Project Initiation#3.7 Existing Site Investigation|Section 3.7 – Existing Site Investigation]]
         </b>: This section introduces its subsections which describe the existing site investigation and data collection techniques available and their associated request process.
         </b>: This section introduces its subsections which describe the existing site investigation and data collection techniques available and their associated request process.</p>
             <div class="tab">
             <div class="tab">
                 <b>[[Chapter 3 - Project Initiation#3.7.1 GIS Databases|Section 3.7.1 – GIS Databases]]
                 <p><b>[[Chapter 3 - Project Initiation#3.7.1 GIS Databases|Section 3.7.1 – GIS Databases]]
                 </b>: This section introduces its subsections which describe the uses for and associated limitations of the GIS databases most frequently utilized during the project development process.
                 </b>: This section introduces its subsections which describe the uses for and associated limitations of the GIS databases most frequently utilized during the project development process.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 3 - Project Initiation#3.7.1.1 DelDOT Gateway|Section 3.7.1.1 – DelDOT Gateway]]
                         <p><b>[[Chapter 3 - Project Initiation#3.7.1.1 DelDOT Gateway|Section 3.7.1.1 – DelDOT Gateway]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.7.1.2 NPDES Viewer|Section 3.7.1.2 – NPDES Viewer]]
                         <p><b>[[Chapter 3 - Project Initiation#3.7.1.2 NPDES Viewer|Section 3.7.1.2 – NPDES Viewer]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.7.1.3 DNREC Stormwater Assessment Study GIS|Section 3.7.1.3 – DNREC Stormwater Assessment Study GIS]]
                         <p><b>[[Chapter 3 - Project Initiation#3.7.1.3 DNREC Stormwater Assessment Study GIS|Section 3.7.1.3 – DNREC Stormwater Assessment Study GIS]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.7.1.4 Watershed Resources Registry (WRR)|Section 3.7.1.4 – Watershed Resources Registry (WRR)]]
                         <p><b>[[Chapter 3 - Project Initiation#3.7.1.4 Watershed Resources Registry (WRR)|Section 3.7.1.4 – Watershed Resources Registry (WRR)]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.7.1.5 Flood Planning Tool|Section 3.7.1.5 – Flood Planning Tool]]
                         <p><b>[[Chapter 3 - Project Initiation#3.7.1.5 Flood Planning Tool|Section 3.7.1.5 – Flood Planning Tool]]
                         </b>
                         </b></p>
                     </div>
                     </div>


                 <b>[[Chapter 3 - Project Initiation#3.7.2 Topographic Field Survey|Section 3.7.2 – Topographic Field Survey]]
                 <p><b>[[Chapter 3 - Project Initiation#3.7.2 Topographic Field Survey|Section 3.7.2 – Topographic Field Survey]]
                 </b>: This section describes the process for requesting topographic field surveys performed through DelDOT’s Survey section and introduces its subsections which describe considerations and standards related to topographic field surveys.
                 </b>: This section describes the process for requesting topographic field surveys performed through DelDOT’s Survey section and introduces its subsections which describe considerations and standards related to topographic field surveys.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 3 - Project Initiation#3.7.2.1 Survey Standards|Section 3.7.2.1 – Survey Standards]]
                         <p><b>[[Chapter 3 - Project Initiation#3.7.2.1 Survey Standards|Section 3.7.2.1 – Survey Standards]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.7.2.2 Other Surveying Methods|Section 3.7.2.2 – Other Surveying Methods]]
                         <p><b>[[Chapter 3 - Project Initiation#3.7.2.2 Other Surveying Methods|Section 3.7.2.2 – Other Surveying Methods]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.7.2.3 Pedestrian Connection Survey Considerations|Section 3.7.2.3 – Pedestrian Connection Survey Considerations]]
                         <p><b>[[Chapter 3 - Project Initiation#3.7.2.3 Pedestrian Connection Survey Considerations|Section 3.7.2.3 – Pedestrian Connection Survey Considerations]]
                         </b>
                         </b></p>


                         <b>[[Chapter 3 - Project Initiation#3.7.2.4 Bridge Design Survey Considerations|Section 3.7.2.4 – Bridge Design Survey Considerations]]
                         <p><b>[[Chapter 3 - Project Initiation#3.7.2.4 Bridge Design Survey Considerations|Section 3.7.2.4 – Bridge Design Survey Considerations]]
                         </b>
                         </b></p>
                     </div>
                     </div>


                 <b>[[Chapter 3 - Project Initiation#3.7.3 Traffic Data and Functional Classification Designation|Section 3.7.3 – Traffic Data and Functional Classification Designation]]
                 <p><b>[[Chapter 3 - Project Initiation#3.7.3 Traffic Data and Functional Classification Designation|Section 3.7.3 – Traffic Data and Functional Classification Designation]]
                 </b>
                 </b></p>


                 <b>[[Chapter 3 - Project Initiation#3.7.4 Property Rights Research|Section 3.7.4 – Property Rights Research]]
                 <p><b>[[Chapter 3 - Project Initiation#3.7.4 Property Rights Research|Section 3.7.4 – Property Rights Research]]
                 </b>
                 </b></p>


                 <b>[[Chapter 3 - Project Initiation#3.7.5 Crash Data|Section 3.7.5 – Crash Data]]
                 <p><b>[[Chapter 3 - Project Initiation#3.7.5 Crash Data|Section 3.7.5 – Crash Data]]
                 </b>
                 </b></p>


                 <b>[[Chapter 3 - Project Initiation#3.7.6 Utility Designation|Section 3.7.6 – Utility Designation]]
                 <p><b>[[Chapter 3 - Project Initiation#3.7.6 Utility Designation|Section 3.7.6 – Utility Designation]]
                 </b>
                 </b></p>


                 <b>[[Chapter 3 - Project Initiation#3.7.7 Pavement Corings|Section 3.7.7 – Pavement Corings]]
                 <p><b>[[Chapter 3 - Project Initiation#3.7.7 Pavement Corings|Section 3.7.7 – Pavement Corings]]
                 </b>
                 </b></p>


                 <b>[[Chapter 3 - Project Initiation#3.7.8 Traffic Counts|Section 3.7.8 – Traffic Counts]]
                 <p><b>[[Chapter 3 - Project Initiation#3.7.8 Traffic Counts|Section 3.7.8 – Traffic Counts]]
                 </b>
                 </b></p>


                 <b>[[Chapter 3 - Project Initiation#3.7.9 Pipe Video Inspection|Section 3.7.9 – Pipe Video Inspection]]
                 <p><b>[[Chapter 3 - Project Initiation#3.7.9 Pipe Video Inspection|Section 3.7.9 – Pipe Video Inspection]]
                 </b>
                 </b></p>


                 <b>[[Chapter 3 - Project Initiation#3.7.10 Soil Borings|Section 3.7.10 – Soil Borings]]
                 <p><b>[[Chapter 3 - Project Initiation#3.7.10 Soil Borings|Section 3.7.10 – Soil Borings]]
                 </b>: This section outlines applications that require soil borings and introduces its subsections.
                 </b>: This section outlines applications that require soil borings and introduces its subsections.</p>
                     <div class="tab">
                     <div class="tab">
                         <b>[[Chapter 3 - Project Initiation#3.7.10.1 Borings Performed Through On-Call Drilling Agreements|Section 3.7.10.1 – Borings Performed Through On-Call Drilling Agreements]]
                         <p><b>[[Chapter 3 - Project Initiation#3.7.10.1 Borings Performed Through On-Call Drilling Agreements|Section 3.7.10.1 – Borings Performed Through On-Call Drilling Agreements]]
                         </b>: This section describes the process for requesting soil borings through DelDOT’s on-call drilling agreements.
                         </b>: This section describes the process for requesting soil borings through DelDOT’s on-call drilling agreements.</p>


                         <b>[[Chapter 3 - Project Initiation#3.7.10.2 Borings Performed Under Other Professional Service Agreements|Section 3.7.10.2 – Borings Performed Under Other Professional Service Agreements]]
                         <p><b>[[Chapter 3 - Project Initiation#3.7.10.2 Borings Performed Under Other Professional Service Agreements|Section 3.7.10.2 – Borings Performed Under Other Professional Service Agreements]]
                         </b>: This section outlines the process to follow when soil borings are to be performed under a professional services agreement other than DelDOT’s on-call drilling services agreement.
                         </b>: This section outlines the process to follow when soil borings are to be performed under a professional services agreement other than DelDOT’s on-call drilling services agreement.</p>
                     </div>
                     </div>
             </div>
             </div>
     </div>
     </div>

Revision as of 19:08, 12 April 2024

This DelDOT Project Development manual has been developed to serve as a task-oriented guide to be referenced throughout the project development process to promote consistent, transparent, and efficient project delivery which adheres to all pertinent state and federal requirements.

Enhanced Table of Contents

This enhanced table of contents was created to assist staff in locating and then accessing the project development related information they are seeking. This enhanced table of contents provides a brief description of the individual sections of the manual and purposefully includes key words to make it simple to quickly search.

Chapter 1 - Introduction

This chapter defines the project development process and its goals. The section introduces its subsections which outline the manual’s intended uses, limitations, and update process.

Section 1.1 – Federal and State Requirements: This section presents the framework of the laws, regulations, and other regulatory agency policy or advisory guidance at both the state and federal level which direct the DelDOT project development process. The section introduces the FHWA Federal-aid Highway Program and the DelDOT and FHWA Stewardship and Oversight agreement and its role in defining the DelDOT project development process.

Section 1.2 - Applicability to Local Public Agencies: This section establishes the manual’s applicability to local public agencies.

Section 1.3 - References to Other Resources: This section clarifies that the manual is not intended to replace other source documents referenced throughout the manual.

Section 1.3.1 - DelDOT Developed Resource Documents: This section lists and describes the resource documents DelDOT utilizes including manuals, Design Guidance Memorandums (DGMs), Policy Implements (PIs), Engineering Instructions (EIs), formal memorandums, and other guidance documents. The section also provides several considerations for the assigned update team when revising these DelDOT developed resource documents.

Section 1.4 - Maintaining the Project Development Manual: This section establishes the process which DelDOT will use to maintain the Project Development manual and outlines how manual users can provide feedback.

Chapter 2 – Project Origination and Planning

This chapter details the process that DelDOT uses to plan and prioritize projects.

Section 2.1 - Planning Standards: This section describes the federal planning standards that a state must follow to be eligible for federal funding through the Federal-aid Highway Program. This section has been divided into subsections for clarity.

Section 2.1.1 - Contributing Organizations: This section defines the entities involved in the federal planning and programming process as well as describes their responsibilities.

Section 2.1.2 - Performance-Based Approach : DelDOT is required to utilize a performance-based prioritization process in accordance with state and federal requirements. This section defines these requirements and describes the processes DelDOT has implemented.

Section 2.1.3 - Public Involvement : Public involvement is required in the planning and programming process transportation infrastructure has significant impact on communities. This section defines the public involvement processes DelDOT has implemented to ensure proactive and well-thought-out public engagement.

Section 2.1.4 - Deliverables : DelDOT’s planning process will result in the creation of numerous deliverables. This section’s subsections describe the two deliverables required of DelDOT by federal and state law.

Section 2.1.4.1 - Long-Range Transportation Plan : This planning deliverable is intended to guide DelDOT in creating principles, policies, and performance measures meeting the State’s long-range economic, transportation, development, and sustainability goals over the forecast period.

Section 2.1.4.2 - Statewide Transportation Improvement Program (STIP) : This planning deliverable defines a staged, multi-year, statewide intermodal investment program comprised of transportation projects and programs that are consistent with the Long-Range Transportation Plan.

Section 2.2 - Programs Generating DelDOT Projects : DelDOT maintains multiple programs across its Divisions which each have their own process for generating and prioritizing projects. This section defines the programs and the processes that are used to generate DelDOT projects.

Section 2.2.1 - Entities Outside of DelDOT : This section introduces its subsections which describe entities and programs outside of DelDOT which have potential to generate DelDOT projects.

Section 2.2.2 - Division of Planning : DelDOT’s Division of Planning undertakes various planning level studies which could generate DelDOT projects. This section’s subsections describe the individual planning programs overseen by the Division of Planning that may generate DelDOT projects.

Section 2.2.3 - Structures Program : This section introduces its subsections which describe the three programs DelDOT uses to evaluate, plan, and prioritize structure maintenance throughout the State.

Section 2.2.4 - Pavement Management Program

Section 2.2.5 - Traffic Engineering and Traffic Operations : This section introduces the specific strategic programs that DelDOT uses to identify operational and mobility deficiencies and potential safety related infrastructure improvement needs. Specific programs are further described within its subsections.

Section 2.2.6 - Division of Maintenance and Operations : This section introduces the programs that are managed by DelDOT’s Division of Maintenance and Operations which are more fully described within its subsections.

Section 2.2.7 - Sustainability : This section introduces its subsections which describe the individual programs that DelDOT uses to plan and prioritize its sustainability program.

Section 2.2.8 - Transit Systems (Delaware Transit Corporation)

Chapter 3 – Project Initiation

This chapter documents the numerous tasks that a section must perform as part of the project initiation process once assigned a project.

Section 3.1 - Establishment of the Design Team

       This section defines the role of the DelDOT Project Manager and the technical design staff assigned to a develop a project. The section also provides considerations to be evaluated when assembling the design team.

Section 3.1.1 - Support Groups : This section defines DelDOT’s Support Groups and establishes their role in the project development process.

Section 3.2 - Project Baselining : This section introduces the concept of project baselining and introduces its subsections.

Section 3.2.1 - Initial Project Baselining : This section establishes the interrelated elements of the initial project baselining effort and introduces its subsections which defines each element and its associated considerations in more detail.

Section 3.2.2 - Project Re-Baselining : This section emphasizes the importance of re-baselining projects and introduces its subsections which describe two specific re-baselining activities.

Section 3.2.2.1 - Re-Baselining at Milestone Submissions : This section describes DelDOT’s policy of re-baselining projects within Unifier at each milestone submission.

Section 3.2.2.2 - Spend Updates : This section describes DelDOT’s policy of evaluating the actual rate of project expenditures compared to the expected expenditure rate in order to evaluate the accuracy of a project’s spending plan.

Section 3.3 - Project Number Request : This section describes the process to obtain a project number through DelDOT’s Unifier software.

Section 3.4 - Professional Services : This section introduces the concept of professional services and introduces its subsections.

Section 3.4.1 - Professional Services Procurement : This section introduces DelDOT’s Professional Services Procurement manual and divides the project development professional services DelDOT procures into two categories which are discussed further within its subsections.

Section 3.4.1.1 - Design Related Professional Services : This section introduces the professional service indefinite delivery/ indefinite quantity (IDIQ) contracts DelDOT utilizes for the typical project development services the Department requires. The section also describes the process DelDOT uses to setup tasks under an IDIQ professional service agreement.

Section 3.4.1.2 - Design Support Related Professional Services : This section discusses the design support related professional services DelDOT utilizes (i.e., soil borings, utility designation, test holes etc.). The section also describes the process DelDOT uses to setup tasks under an IDIQ professional service agreement.

Section 3.4.2 - Professional Services Management : This section’s subsections summarize the Project Manager’s responsibilities for managing professional service tasks.

Section 3.4.2.1 - Project Tracking : This section presents project tracking techniques that can be used by the Project Manager to forecast future project milestone submittal dates and associated costs. Techniques presented included performing regularly scheduled task progress meetings and invoice tracking. The section also describes the approval process for extra work.

Section 3.4.2.2 - Invoicing : This section describes the time window and processes that DelDOT uses to verify invoice accuracy and then circulate and approve professional service invoices.

Section 3.4.2.2.1 - Fiscal Year End : This section notifies the Project Manager and DelDOT’s contracted professional service vendors to the end of the State fiscal year finance system shut down.

Section 3.4.2.3 - Quality Assurance : This section summarizes the Project Manager’s responsibility to perform quality assurance on project deliverables, to review and evaluate the services of the vendor annually, and to document the vendor’s performance at the end of the contract.

Section 3.4.2.4 - Closeout : This section establishes the process to closeout tasks upon completion or when DelDOT has decided to terminate the service before its completion.

Section 3.5 - Establishment of Project Directory : This section establishes the importance of using consistent project directories and introduces its subsections which describe DelDOT’s typical project development related directories.

Section 3.6 - Project Scoping : This section describes the best practices for performing project scoping and arriving at a preferred alternative for further design. The section also introduces the concept of scope management which ensures the project remains consistent with its original objectives.

Section 3.6.1 - Define the Project Objective : This section encourages the development of explicit and clear project objectives that indicate why a project is being undertaken and what the project is intended to achieve. The section also introduces the concept of “purpose and need” statements to assist in refining a project’s scope and subsequent objectives.

Section 3.6.2 – Develop the Scoping Process : This section encourages the design team to tailor the scoping process to suit an individual project’s needs. The section’s subsections outline scoping phase considerations and describe scoping phase tools.

Section 3.6.2.1 – NEPA Class Requirements : This section describes how the NEPA class of a proposed action will affect the project scoping phase.

Section 3.6.2.2 – Scoping Meetings : This section describes strategies and considerations for conducting meetings with project stakeholders at strategic points in the scoping phase.

Section 3.6.2.3 – Public Involvement : This section describes how public involvement can be used to generate public consensus by providing a forum for users to express their needs, ideas, concerns, and perspectives relating to the transportation system while giving DelDOT the opportunity to educate the public about transportation issues, services, and projects.

Section 3.6.3 – Establish Preliminary Design Controls and Criteria : This section describes the process for determining the transportation user groups to accommodate and for selecting associated design controls and criteria to ensure the development of suitable alternatives.

Section 3.6.4 – Establish Project Constraints : This section introduces its subsections which detail several common project constraints and limitations that must be vetted within the project scoping phase.

Section 3.6.5 – Alternatives Development : This section describes the process used to develop conceptual alternatives that meet the project’s objectives while considering the project’s constraints and associated design controls and criteria.

Section 3.6.5.1 – Alternative Types : This section describes the array of solutions that can be applied to rectify identified transportation deficiencies and meet the project’s objectives.

Section 3.6.6 – Alternativities Assessment : This section describes the process used to evaluate the feasible alternatives developed.

Section 3.6.7 – Process Documentation : This section provides recommendations on how to summarize the early project level decisions so they can be effectively referenced later in the project development process.

Section 3.6.8 – Evaluate Ancillary Considerations : This section introduces its subsections which describe the parameters and considerations to be evaluated once a preferred alternative has been selected.

Section 3.7 – Existing Site Investigation : This section introduces its subsections which describe the existing site investigation and data collection techniques available and their associated request process.

Section 3.7.1 – GIS Databases : This section introduces its subsections which describe the uses for and associated limitations of the GIS databases most frequently utilized during the project development process.

Section 3.7.2 – Topographic Field Survey : This section describes the process for requesting topographic field surveys performed through DelDOT’s Survey section and introduces its subsections which describe considerations and standards related to topographic field surveys.

Section 3.7.3 – Traffic Data and Functional Classification Designation

Section 3.7.4 – Property Rights Research

Section 3.7.5 – Crash Data

Section 3.7.6 – Utility Designation

Section 3.7.7 – Pavement Corings

Section 3.7.8 – Traffic Counts

Section 3.7.9 – Pipe Video Inspection

Section 3.7.10 – Soil Borings : This section outlines applications that require soil borings and introduces its subsections.

Section 3.7.10.1 – Borings Performed Through On-Call Drilling Agreements : This section describes the process for requesting soil borings through DelDOT’s on-call drilling agreements.

Section 3.7.10.2 – Borings Performed Under Other Professional Service Agreements : This section outlines the process to follow when soil borings are to be performed under a professional services agreement other than DelDOT’s on-call drilling services agreement.