Category:Detail 350.01

From DelDOT Project Development Manual
Revision as of 16:16, 27 October 2022 by Jtice (talk | contribs) (Created page with "==PIPE CULVERT DETAILS== ==Changelog== ===2022=== * Sheet 1 ** Updated guardrail over culvert to depict current standards. ** Adjusted pipe sizes in plan view to match. ** Differentiated geotextile, riprap and geotextile, stabilization. ** Added min spacing between pipes when flowable fill is used. ** Added reference to Designer Note 10. * Sheet 2 ** Updated guardrail over culverts on section view for current standards. ** Changed note for offset to hinge. ** Edited Des...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

PIPE CULVERT DETAILS

Changelog

2022

  • Sheet 1
    • Updated guardrail over culvert to depict current standards.
    • Adjusted pipe sizes in plan view to match.
    • Differentiated geotextile, riprap and geotextile, stabilization.
    • Added min spacing between pipes when flowable fill is used.
    • Added reference to Designer Note 10.
  • Sheet 2
    • Updated guardrail over culverts on section view for current standards.
    • Changed note for offset to hinge.
    • Edited Designer Note 10

This category currently contains no pages or media.