Main public logs
Jump to navigation
Jump to search
Combined display of all available logs of DelDOT Project Development Manual. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 15:12, 5 August 2025 BBarnard talk contribs deleted page 111 - Construction Coordination (content was: "{{GlobalNav}} == 111.1 Working Drawings == Working drawings submitted for acceptance shall be prepared by the contractor in accordance with the requirements of the Plans, Department Standards, Special Provisions and [https://deldot.gov/Publications/manuals/standard_specifications/pdfs/2020/2020_standard_specifications.pdf Standard Specifications]''.'' Working drawing review is conducted to ensure that fabrication of items is in accordance with the intent of the Contract Documen...")