Category:Detail 350.01

From DelDOT Project Development Manual
Revision as of 16:03, 3 November 2022 by Jtice (talk | contribs) (Corrected changelog)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

PIPE CULVERT DETAILS

Changelog

2022

  • Sheet 1
    • Updated guardrail over culvert to depict current standards.
    • Adjusted pipe sizes in plan view to match.
    • Added min spacing between pipes when flowable fill is used.
  • Sheet 2
    • Updated guardrail over culverts on section view for current standards.
    • Differentiated geotextile, riprap and geotextile, stabilization.
    • Changed note for offset to hinge.
    • Edited Designer Note 10
    • Added reference to Designer Note 10.

This category currently contains no pages or media.