Category:Detail 355.01
Jump to navigation
Jump to search
PRECAST CONCRETE BOX CULVERT DETAILS
Changelog
2022
- Sheet 1
- Added stone around all wingwall corners and extended down slope to CBF.
- Updated guardail and barrier to current standards.
- Added barrier reference to Detail 325.02.
- Added bottom of structural foundation notation.
- Differentiated geotextile, riprap and geotextile, stabilization.
- Added reference to Designer Note 12.
- Sheet 3
- Edited Designer Notes 5 and 12.
This category currently contains no pages or media.